Tasks To Be Completed Prior To Design

Type of Project (Spike, Sprint, Epic): 

Goals

Goals: Must Have, Should Have, Could Have and Won’t Have

Must Have means we must have this as part of the solution. It is a requirement or we should rethink doing this work.  This is what we will deliver before the end of the work period this also doubles as our DOD “Definition Of Done”

 Should have means we would be embarrassed not to have it. We could technically produce the solution without it but people would be surprised.

Could have means anything else we could do.  But this does not always mean low priority.  But our selection of which could haves to include or exclude (or deliver later).  Also is considered low hanging fruit (if we are in this code already for x reason we can deliver  y with little or no extra effort) or can be items or ideas for this module that can be packaged for a later spike or sprint.

Won’t Have means this will not happen.  It might be technically impossible, a taboo for our organization or out of scope. It does not mean “might happen or would be nice”. 

Must Have:

Should Have:

Could Have:

Won’t Have:

General Info

Topic: Visit Scheduling/Queueing

Lead (Product Owner): ??

Known Developers Assigned (amount of effort in hrs dedicated to this work if possible): 

Date: TBD

How to Participate

Add your name to the list on this wiki page (with any comments about your availability). If you want to join after the sprint has started just join the IRC channel mentioned above and say hello.

The general process:

  1. New to OpenMRS sprints? Want help getting started? Join the IRC channel and say "???": I'd like to participate in the sprint!"
  2. Pick a ticket from the available tickets in the top-left of the sprint dashboard page. (listed below)
    • Make sure it does not depend on a ticket that is incomplete.
  3. If you have any questions about the ticket, ask on the group chat
  4. Do the ticket. See our HOWTO for git. Sprint specific git HOWTO for devs with push rights: whatever works for you :-) If you don't like pull requests, don't send them. Commit and push directly to the main repo. If you do like pull requests, fork the main repo and send pull requests, but merge them right after. My favorite way is to work on the main repo, but create local branches (without pushing them to the main repo). Merge branches locally to the master and push to the main repo.
  5. Join the daily scrum to share your updates

Backlog 

These are a combination of parent tickets with child tickets underneath to break up the work or tickets needed for completion of the work.  These tickets should be made in as much detail as possible going into the design calls through use of the mail groups and small group design meetings.  Larger design calls will be used to answer questions these groups cannot or for the community to resolve.

All tickets should have in their description a DOD (Definition of Done) or what it should have accomplished

Tickets involved:

Design

There should be multiple design meetings.  The first starts off with a small group working with the leader to determine the high level scope of the project and then to break down into smaller pieces to eventually place as tickets.  Once those meetings have happened use of the community design meeting time should be used to refine the tickets and if possible assign them to who will be doing the work.

Risks (these should be resolved prior to or during the design meetings):

Enter anything that is still questionable or worrisome that has not been answered (open issues, potential concerns) Once a decision is made make sure that a summarized answer is included.

Example: Q. How will we handle issues with conflicting userID’s?

All ID’s will have an added identifier that is unique.

Effort Accounted For (At the end of the design call all tickets should have an estimated effort and that total should be balanced against the known available effort of the developers assigned) (Yes/No)

 If not in balance in favor of success why and the action plan for remaining items

Group Chat

via IRC on the #openmrs channel on freenode.

Use this channel for ALL debugging and random questions having to do with the sprint. Please avoid direct messaging to personal contacts. If you have a question, someone else most likely does too, and our geographically distributed community benefits from public group discussion.

Kickoff Meeting

 Kickoff meeting Date: TBD

(Meeting setup with known developers after the final design meeting, but prior to the start date):

      

Kickoff Meeting Checklist

  1. Do we know where we are going? (Yes/No)
    1. Do we know the problem we are solving (yes/no). 
    2. Do we have a complete backlog of items to complete this work? (yes/no)
    3. Do we know our scope and priorities? (yes/no)
    4. Have we defined success? (yes/no)
  2. Do we know how to get there?
    1. Do we have any unknowns to be decided during the sprint? If Yes what are they?
    2. Do we know who is doing what on our project? (yes/no)
    3. Do we have a test to complete prior to completion beyond our normal submit process? (Yes/No).
    4. Do we have a high level architecture that is understood by the whole team? (This page fully completed will accomplish this)  (Yes/No)
    5. Do we know the biggest constraint that is likely to inhibit our success? (Yes and no) If no what is it?
    6. Is this a part of a larger story or epic? (Yes/No) If Yes please link
  3. Are we set up to succeed?
    1. Do we have the right people? (yes)
    2. Have we cleared the decks of all other distractions? 

During Project Notes

Add notes, comments, concerns, that occurred during the sprint that should be noted to help in the retrospective.

Post Project (Retrospective)

Did we complete tickets to a 100% DOD? (Yes/No) if no, have those tickets been assessed and placed for future work if needed?

                What did we do well?

                What could we do better?

                What should we not do again?

Resources

Tickets: ??

Kickoff meeting recording: ??